The PM Surya Ghar subsidy, explained simply.
Up to ₹78,000 from the central government, paid straight into your bank account after your system is commissioned. Here is exactly how much you get, how to claim it, and where to check it yourself.
1 kW: ₹30,000 · 2 kW: ₹60,000 · 3 kW and above: ₹78,000
The subsidy grows up to 3 kW — then it stops
Gold is what the government pays. Navy is what you pay. A bigger system costs more, but the subsidy stays the same.
| kW | Government subsidy | You pay |
|---|---|---|
| 1 kW | ₹30,000 | ₹42,000 |
| 2 kW | ₹60,000 | ₹84,000 |
| 3 kW | ₹78,000 | ₹1,38,000 |
| 4 kW | ₹78,000 | ₹2,10,000 |
| 5 kW | ₹78,000 | ₹2,82,000 |
Maximum subsidy
₹78,000
For any home system of 3 kW or more. A 5 kW or 10 kW system gets the same ₹78,000.
Paid to your bank account
You pay the installer first. The subsidy is credited to your account after commissioning — usually 25–30 days after the papers are submitted.
Size for your bill, not the subsidy
Going above 3 kW adds cost but no subsidy. It is worth it only if your electricity use needs it.
Low-interest loan available
The scheme allows collateral-free bank loans for home systems up to 3 kW, at around 7% when it was approved. Check the current rate with your bank.
Ground Realities & Solar Benchmarks
3.88
Units / kW / Day
Yearly average, Jharkhand benchmark (PVGIS)
₹78,000
Max Central Subsidy
Direct to bank on systems ≥ 3 kW
~90–100%
Bill Reduction
When the system covers your full usage
5–7 Years
Typical Payback
For a 3 kW system on ~350 units/month, after subsidy
Five steps on the national portal
Every step happens on pmsuryaghar.gov.in. We do the paperwork with you, but the application is always in your name.
- 1
Register on the portal
Choose your state and electricity provider (JBVNL), enter your electricity consumer number, mobile and email.
⏱️ 1 day · You, with our help
⏱️ 1 dayYou, with our help - 2
Apply for feasibility
Submit the rooftop solar application. JBVNL checks your sanctioned load and local transformer capacity.
⏱️ 7–21 days · JBVNL
⏱️ 7–21 daysJBVNL - 3
Install with a registered vendor
A vendor registered on the portal installs ALMM-listed panels. Non-ALMM equipment gets the subsidy rejected.
⏱️ 1–3 days on site · Registered vendor
⏱️ 1–3 days on siteRegistered vendor - 4
Net meter and inspection
JBVNL inspects the system and installs the net meter. The commissioning report is issued on the portal.
⏱️ 25–30 days · JBVNL
⏱️ 25–30 daysJBVNL - 5
Submit bank details, receive subsidy
Enter your bank account and upload a cancelled cheque. The subsidy is paid directly to your account.
⏱️ 25–30 days · MNRE
⏱️ 25–30 daysMNRE
Why subsidy claims get stuck
Most rejections come from a few avoidable mistakes. We check each one before installation.
Panels not on the ALMM list
Only modules on the government ALMM list qualify. Ask for the model number and check it before you pay.
Aadhaar not linked to the bank account
The subsidy is paid by DBT. If Aadhaar is not linked to your bank, or names differ across the bill, Aadhaar and bank, payment stalls.
Installing before approval
Do not install until JBVNL has approved feasibility on the portal. An early installation can make the claim invalid.
Vendor not registered on the portal
The installer must be registered on pmsuryaghar.gov.in. You can see the vendor list on the portal itself.
Panels not on the ALMM list
Only modules on the government ALMM list qualify. Ask for the model number and check it before you pay.
Aadhaar not linked to the bank account
The subsidy is paid by DBT. If Aadhaar is not linked to your bank, or names differ across the bill, Aadhaar and bank, payment stalls.
Installing before approval
Do not install until JBVNL has approved feasibility on the portal. An early installation can make the claim invalid.
Vendor not registered on the portal
The installer must be registered on pmsuryaghar.gov.in. You can see the vendor list on the portal itself.
Check it yourself on government websites
Do not rely on us or anyone else for scheme details. These are the official Government of India pages.
- 🇮🇳 pmsuryaghar.gov.inPM Surya Ghar: Muft Bijli Yojana — National Portal (opens in a new tab)The official Government of India (MNRE) portal. Register, apply and track your application here.
- 🇮🇳 consumer.pmsuryaghar.gov.inConsumer login & registration (opens in a new tab)Log in with your electricity consumer number and mobile, submit bank details, and follow your subsidy.
- 🇮🇳 mnre.gov.inMNRE — Grid Connected Rooftop Solar Programme (opens in a new tab)The Ministry of New and Renewable Energy programme page, with guidelines and notices.
- 🇮🇳 pib.gov.inCabinet approval — subsidy amounts (PIB) (opens in a new tab)The Press Information Bureau release: subsidy for 1, 2 and 3 kW systems and the loan facility.
Solar Center is not a government body. Apply only on .gov.in websites — never through links sent by SMS or WhatsApp.