How we estimate your solar generation
The short version. We use 19 years of weather data for your district, allow for your roof, subtract realistic losses, and take the lower of two independent sources for every month. Your savings are calculated from that conservative figure.
1. Sunlight for your district. PVGIS 5.3, a free public tool from the European Commission, with its ERA5 weather data for 2005–2023, gives the expected panel output at each district headquarters for every month.
2. Your roof. A flat RCC roof gets a stand tilted towards the south at the best angle for your district. A tin or tiled roof keeps the panels flat on the slope, so its direction matters. Heat, which lowers output in summer, and hills on the horizon are included.
3. Realistic losses. We subtract 14% for wiring, the inverter and dust on the panels.
4. A second opinion. Weather-model data tends to over-estimate sunshine in hazy winter months, so we compare every month with NASA POWER and use whichever is lower.
What this data can and cannot tell you
It is reliable for:
- How output rises and falls through the year, including the monsoon dip
- How much a roof's direction and angle change output
- How much one year can differ from another
- Differences between districts
It cannot tell you:
- Shade from a water tank, stair room, tree or a neighbour's building. We check this on the free site visit.
- Exactly what your system will produce. It is an estimate from weather data, not a reading from your roof, and not a promise.
A study comparing this weather data with 27 India Meteorological Department stations found it close to ground readings on average, with a slight under-estimate in the monsoon. Where it is weakest — hazy winters — our second-source rule applies.
Solar terms, explained
The words you will see in your estimate, in plain language.
What does kW (or kWp) mean?↓
What is a unit (kWh)?↓
What is solar irradiation?↓
What is GHI?↓
Why does the tilt of the panels matter?↓
Why does the direction of my roof matter?↓
What is specific yield?↓
What are system losses?↓
Why is May not the best month if it is so sunny?↓
What is reanalysis (ERA5) data?↓
What is PVGIS?↓
What is NASA POWER?↓
What does "conservative estimate" mean here?↓
What does the lighter band on the chart show?↓
The figures behind every estimate
Every public number we use, with its source and the date we last checked it.
| Figure | Value | Unit | Source | Verified |
|---|---|---|---|---|
| Installed cost benchmark | 72000 INR/kW | INR/kW | Owner-confirmed on-grid installed cost with ALMM modules in Jharkhand (3 kW ≈ ₹2.1–2.2 lakh, 2026-09-27) | 2026-11-18 |
| Hazaribagh generation, kWh per kW per day | Conservative: 3.88 kWh/kW/day Spring peak: 4.39 kWh/kW/day Summer and monsoon: 3.05 kWh/kW/day Autumn: 4.16 kWh/kW/day Winter: 4.32 kWh/kW/day Annual average: 3.88 kWh/kW/day | kWh/kW/day | PVGIS 5.3 (EC Joint Research Centre), PVGIS-ERA5, 2005–2023: 1 kWp at Hazaribagh, 14% system loss | 2026-11-18 |
| Net-metering feasibility timeline | 7–21 days | days | Solar Center operating experience (owner-confirmed 2026-09-23) | 2026-11-18 |
| Net-metering fees up to 50 kW | Application fee: 250 INR Registration fee: 1000 INR | INR | JBVNL sub-division net-metering fee structure | 2026-11-18 |
| Bidirectional meter installation timeline | 25–30 days | days | Solar Center operating experience (owner-confirmed 2026-09-23) | 2026-11-18 |
| Distribution transformer capacity ceiling | 15 percentage | percentage | JBVNL Distribution Transformer 15% rated capacity ceiling rule | 2026-11-18 |
| Rate for unadjusted banked solar energy | 0.5 INR/kWh | INR/kWh | JSERC notified rate for unadjusted banked solar energy credits | 2026-11-18 |
| Roof area per kW | 60 sqft/kW | sqft/kW | Standard crystalline module rooftop footprint rule | 2026-11-18 |
| Central subsidy cap | 78000 INR | INR | https://pmsuryaghar.gov.in — Hard cap at 3 kW for residential systems | 2026-11-18 |
| Central subsidy for the first 2 kW | 30000 INR/kW | INR/kW | https://pmsuryaghar.gov.in | 2026-11-18 |
| Central subsidy for the third kW | 18000 INR | INR | https://pmsuryaghar.gov.in | 2026-11-18 |
| Subsidy disbursal timeline | 25–30 days | days | Solar Center operating experience (owner-confirmed 2026-09-23) | 2026-11-18 |
| JBVNL domestic tariff slabs | 0–200 units at 0 INR/kWh 200–400 units at 4.8 INR/kWh 400+ units at 6.85 INR/kWh | INR/kWh | Base rate: JSERC True-up FY23-24 & ARR/Tariff FY2025-26 Order (jserc.org/pdf/tariff_order/jbvnl-2025.pdf), Ch.12 p.258-259, applicable from 01.05.2025 — flat Rs 6.85/kWh urban, non-telescopic; corroborated by India TV/Daily Pioneer/Deccan Herald coverage of the same May-2025 hike. Khushhali 200/400-unit bands and the Rs 2.05/unit 201-400 subsidy: converging secondary sources (govtschemes.in, Times Now Hindi, tankcalculator.com) — no primary government order text confirmed. Replaces the prior four-slab telescoping table (Rs 3.25-7.50), which matched no current JSERC order. | 2026-11-18 |
| JBVNL electricity duty | 0.05 ratio | ratio | JSERC order confirms duty is levied separately under the state Electricity Duty Act (Ch.13 Cl.II) but does not itself state the %; 5% figure carried over from prior verification, not re-confirmed against the Duty Act this pass. | 2026-11-18 |
| JBVNL domestic fixed charge | 100 INR/month | INR/month | JSERC True-up FY23-24 & ARR/Tariff FY2025-26 Order (jserc.org/pdf/tariff_order/jbvnl-2025.pdf), Ch.12 p.258-259, applicable from 01.05.2025 — urban rate (Rural: Rs 75/month, Urban: Rs 100/month). Solar Center defaults to urban, its documented primary segment (docs/01-jharkhand-market-brief.md). | 2026-11-18 |