How much does a rooftop solar system cost in Jharkhand?↓
An on-grid rooftop system with ALMM-certified equipment typically costs around ₹72,000 per kW installed in Jharkhand, before subsidy — so a 3 kW system comes to about ₹2.1–2.2 lakh. The ₹78,000 central subsidy is then credited to your bank account after commissioning, bringing your net cost to roughly ₹1.3–1.4 lakh. Your exact price depends on roof type, panel brand, and structure, which is why we always give a written, itemized quote instead of a flat number over the phone.
Why doesn’t a 5 kW or 10 kW system get more subsidy than a 3 kW system?↓
The central PM Surya Ghar subsidy is slabbed — ₹30,000 for 1 kW, ₹60,000 for 2 kW — and then flatlines at ₹78,000 for every system of 3 kW and above. That’s the policy design, not a Solar Center limit, so any vendor promising more on a larger residential system is misreading, or misrepresenting, the scheme.
Do I have to pay the entire cost upfront?↓
No. We follow a staged payment structure: a small booking amount on signing against a GST invoice, the main payment on material delivery once you’ve verified the model numbers match your quote, and the balance only after commissioning and net-meter activation.
Technical & Performance
Installation & Performance
How solar actually behaves on your roof, in your weather, on your grid.
Does solar actually work during the monsoon or on cloudy days?↓
Yes — generation drops on cloudy and monsoon days (roughly 2.5–3.4 units a day per kW in July–September, against about 4.5 in January–March, per PVGIS data for Jharkhand cross-checked with NASA POWER) but it doesn’t stop. We size every system on the realistic annual average, not the best sunny day, so your bill-savings estimate already accounts for the monsoon dip.
How much roof space do I actually need?↓
A rough planning number is about 60 sq ft per kW of panels, so a 3 kW system needs roughly 180 sq ft of usable, unshaded area. The exact layout depends on panel wattage, shading from parapets or water tanks, and access — which is why we measure your specific roof during the free site survey instead of quoting off a generic package.
Will my solar system keep the lights on during a power cut?↓
Not with a standard on-grid system — it shuts down automatically during a grid outage for lineman safety (anti-islanding protection), no matter how sunny it is. If daytime and outage backup matters to you, ask us about a hybrid inverter and battery setup; battery cost sits outside the ₹78,000 central subsidy.
Is my requested system size guaranteed to be approved?↓
Not automatically. JBVNL approval depends on your sanctioned electrical load and a rule that solar capacity can’t exceed 15% of your local transformer’s capacity. We check both before we file your application with JBVNL, so we do not apply for a size that is likely to be rejected or cut down.
Process & Trust
Process, Warranty & Privacy
What happens after you sign, who stands behind it, and what we do with your data.
How long does the whole process take, from booking to switching on?↓
Usually about a month until your system is running, and the subsidy reaches your bank about 25–30 days after that. Installation itself takes a day or two; most of the time is two electricity-department steps: 7–21 days for technical feasibility approval and about 25–30 days for the bidirectional meter to be installed and activated.
What warranty do I actually get, and who provides it?↓
The warranty is the manufacturer’s, not Solar Center’s — typically around 25 years on panel performance and a shorter term on the inverter, varying by brand. We get these terms in writing before you sign anything, hold the documentation on your behalf, and help you invoke it if you ever need to.
Who actually installs the system — does Solar Center have its own crew?↓
We operate as an independent consulting and coordination firm: our engineers size your system and handle every electricity-department and subsidy portal step, then oversee installation through vetted, accredited partner crews. We stay the single point of accountability from your first call to your subsidy deposit, rather than disappearing after the sale.
Do you store my Aadhaar number or banking details?↓
No. e-KYC for the PM Surya Ghar portal happens directly on the government’s own site, and we never ask for or store your Aadhaar number. If we ever need identity documents for our own paperwork, we keep only what’s necessary, encrypted, and accessible strictly to authorised staff.