For Businesses & Institutions

Your roof is working space. Put it to work.

Rooftop solar for shops, clinics, coaching centres, schools, cold stores and factory sheds — sized against the power you use during working hours, with the JBVNL process handled for you.

The site visit is completely free — no visiting fee, no hidden charges. You decide only after you've seen our written proposal.

✓ ALMM-listed panels✓ JBVNL net-metering✓ PM Surya Ghar subsidy support

Why solar suits a business roof

You use power when the sun is up. A shop, clinic or workshop draws most of its load between morning and evening — the same hours your panels generate. More of each unit is used on the spot instead of being exported, which makes the economics stronger than for most homes.

You pay a higher tariff. Non-domestic and industrial connections are billed above the domestic rate, so each unit of solar replaces more expensive grid power. Your proposal uses the tariff from your own bill, not an average.

Know what does not apply. The PM Surya Ghar subsidy is for residential connections only, so a business system is paid for without it. Solar equipment can qualify for higher depreciation under the Income Tax Act — confirm the current rate and your eligibility with your CA before counting on it.

Payback, with the working shown. We never quote a payback period on its own. Your proposal lists the load, tariff, generation and price assumptions behind every number, so your accountant can check it.

What we handle

Sized for your load, documented for your accountant

We coordinate the design, the installation partner and the electricity department.

A load study, not a guess

We read 6–12 months of bills and your working hours to size the system, so you are not paying for panels whose power you export cheaply.

Structure checked first

RCC roofs and metal sheds carry load differently. A structural stability certificate is part of the JBVNL paperwork, and we arrange it before installation.

JBVNL net metering, end to end

Application, feasibility, inspection and the net meter. The 15% transformer limit applies to businesses too, and we check it before we file your application.

Group and virtual net metering

Since February 2024, several connections in the same electricity-department area can share one installation — useful when a shop and a home, or several units, have separate meters.

How a business project runs

From load study to net meter

Realistic timings. The electricity department steps are outside our control, and we say so.

  1. 1

    Site assessment and load study

    Roof, structure, shading, sanctioned load and 6–12 months of bills.

    ⏱️ Within a week · Solar Center

  2. 2

    Proposal with assumptions

    System size, equipment, full price, and the payback working your CA can check.

    ⏱️ 3–5 days · Solar Center

  3. 3

    JBVNL application and feasibility

    Application fee is about ₹250 up to 50 kW and ₹750 from 50 kW to 1 MW, plus registration. JBVNL may approve a smaller size.

    ⏱️ 7–21 days · JBVNL

  4. 4

    Installation and commissioning

    A vetted partner team installs ALMM-listed equipment, scheduled around your working hours.

    ⏱️ Depends on size · Installation partner, supervised by Solar Center

  5. 5

    Inspection and net meter

    JBVNL inspects and installs the net meter. Net metering starts from the next billing cycle.

    ⏱️ 25–30 days · JBVNL

Straight answers

Questions business owners ask us

Is there a subsidy for my shop or factory?↓
Not under PM Surya Ghar — that scheme is for residential connections. A business system is justified by the power it replaces at your tariff, and possibly by depreciation benefits your CA can confirm.
Will it run during a power cut or alongside my generator?↓
A standard on-grid system shuts down when the grid fails. If you need solar during outages, a hybrid system with batteries, or a setup designed to work with your DG set, is possible but costs more. We will show you both options with prices.
Can you install on a metal shed?↓
Often, yes — with the right mounting and after the structure is checked. Old or thin sheeting may need strengthening first. We tell you that during the assessment, not after installation.
Our premises are rented. Can we still go solar?↓
Yes, if the owner agrees. JBVNL asks for ownership or lease proof, and the owner’s written consent avoids trouble later. We help you put the paperwork together.
What do you need to prepare a proposal?↓
Your last 6–12 months of electricity bills, your sanctioned load, your working hours, and access to the roof for a site visit. That is enough for an honest first proposal.

Get a proposal built on your own bills

Share 6–12 months of electricity bills and book a site assessment. No cost, no pressure.