Solar That Actually Delivers.
One accountable partner, start to finish.
- Free rooftop survey
- JBVNL net-metering, handled for you
- ₹78,000 PM Surya Ghar subsidy, straight to your bank
The site visit is completely free — no visiting fee, no hidden charges. You decide only after you've seen our written proposal.
We coordinate. You are never the one chasing JBVNL.
We don't sell you panels and disappear. We are the partner on your side for the whole process — talks, electricity-department paperwork, meter change, ALMM-compliant installation, and final subsidy disbursement.
The Solar Center Standard
- ✓We coordinate: you never have to chase JBVNL or departmental desks.
- ✓Vetted installation partners: local technicians we have checked and work with directly.
- ✓ALMM-listed modules: 100% compliant for PM Surya Ghar subsidy approval.
- ✓Manufacturer warranties: 25-year performance warranty paperwork handed to you.
- ✓Itemized proposal: total installed price, breakdown, and net cost in writing upfront.
Ground Realities & Solar Benchmarks
3.88
Units / kW / Day
Yearly average, Jharkhand benchmark (PVGIS)
₹78,000
Max Central Subsidy
Direct to bank on systems ≥ 3 kW
~90–100%
Bill Reduction
When the system covers your full usage
5–7 Years
Typical Payback
For a 3 kW system on ~350 units/month, after subsidy
Solar Solutions Designed for Jharkhand
Custom consulting for homes, businesses, and farming.
How It Works: 4 Steps from Survey to Subsidy
Usually running within about a month. The subsidy reaches your bank about 25–30 days after that.
- 1
Rooftop Survey & Sizing
On-site check of your roof space, direction, shading and sanctioned electricity load.
⏱️ 1–2 days · Solar Center team
⏱️ 1–2 daysSolar Center team - 2
JBVNL Feasibility & Portal Application
PM Surya Ghar portal application, the transformer capacity check (the 15% rule) and JBVNL technical approval.
⏱️ 7–21 days · Solar Center coordination
⏱️ 7–21 daysSolar Center coordination - 3
ALMM Installation & Wiring
ALMM-listed panels and a certified inverter, mounted and wired by our vetted partner installers.
⏱️ 1–3 days on site · Vetted partner installer
⏱️ 1–3 days on siteVetted partner installer - 4
Net Meter & Subsidy Credit
JBVNL installs the bidirectional net meter in about 25–30 days. The subsidy then reaches your bank about 25–30 days after commissioning.
⏱️ 25–30 days · JBVNL & MNRE
⏱️ 25–30 daysJBVNL & MNRE
Why Work With Solar Center
What we promise in writing, before you pay anything.
100% ALMM-Listed Modules
Government-approved and BIS-certified modules — required for PM Surya Ghar subsidy eligibility.
A Real Office, Real Accountability
A head office in Hazaribagh and consultants who come to your site anywhere in Jharkhand, not a distant anonymous telecaller.
Transparent Written Proposals
Itemized equipment, gross cost, net price, and realistic generation expectations signed before payment.
End-to-End Net Metering
Technical feasibility check, transformer capacity headroom verification, and JBVNL bi-directional meter coordination.
100% ALMM-Listed Modules
Government-approved and BIS-certified modules — required for PM Surya Ghar subsidy eligibility.
A Real Office, Real Accountability
A head office in Hazaribagh and consultants who come to your site anywhere in Jharkhand, not a distant anonymous telecaller.
Transparent Written Proposals
Itemized equipment, gross cost, net price, and realistic generation expectations signed before payment.
End-to-End Net Metering
Technical feasibility check, transformer capacity headroom verification, and JBVNL bi-directional meter coordination.
What Working With Us Looks Like
Illustrative stories based on typical 3 kW and 5 kW projects — not real customer reviews. We will replace them with real reviews as projects complete.









